Abstract

There are a number of articles that explain conceptually how Lean Six Sigma is being used in Hospitals.  This white paper will present a case study of how we used Lean Six Sigma tools to improve patient-service at a VA (Veterans Affairs) Medical Center.

Background

This VA Medical Center (located in Erie Pennsylvania) is a small facility focused on the Primary Care, Rehabilitation and Mental Health needs of its Veteran-Patients.  Most surgeries and other specialties are handled at the regional hub medical center in Pittsburgh.

Given the focused mission of this medical center they decided to focus Lean Six Sigma on improving patient service in Primary Care.  The quality of care in this medical center was excellent, but seeing patients at their appointment time was poor.  Only 9% of patients were seen on time for their primary care appointment.  This caused stress for patients and for the healthcare providers (Support Staff, Nurses and Physicians).

Project Overview

  • Initial Assessment
  • Performance Scorecard
  • 5S Visual Management
  • Spaghetti Diagrams
  • Time Study / Quickchangeover

We used a variety of Lean tools, over an 8 week period, to improve on-time delivery of care to patients.  Each one will be covered separately.

However, before we go into the details, I will cover how we decided to use the tools show above.  An initial assessment of the department showed three problems.

The first was a lack of awareness of how the department was performing.  Doctors, Nurses and support staff worked all day, went home and had no idea how the overall department had performed that day.  They know how they did, and how their patients were feeling, but there was no connection with the overall Primary Care organization.  Everyone worked in their own silo.

The second problem was a general lack of organization and standardization in the workplace.  The hallways were cluttered and every exam room was set up differently.  It was hard for patients in wheelchairs to maneuver around hallway obstacles.  Providers had to walk around, from room to room looking for instruments and information.

Finally, there was an on-time delivery of care problem due to rooms being used for exams, longer than scheduled.  The department was properly staffed, and technically has enough space, but there was often a lack of rooms available when a patient was ready scheduled to be examined.

Consequently, patients were rarely seen at their appointment time.  Not seeing patients on time caused them to wait longer and leave the exam later than expected.  This resulted in a culture of inefficiency, disorganization and a lack of timeliness.  Patients learned to come late to appointments, because they knew they wouldn’t be seen on time.  Providers got frustrated at the lack of organization in the workplace and had to stay at the hospital longer than their normal shift

Performance Scorecards

Lean is a set of tools to identify and eliminate non value added activities.  It creates visibility.  The first step in our Lean journey was to create visibility.  The Lean Team (Doctors, Nurses, Support Staff) created the Primary Care Performance Scorecard.  This scorecard represents a few key performance indicators.

You will notice that there are just five measures.  The fewer the number of measures, the more focus each one gets.

We started with the Purpose, or Mission, of the Primary Care department.  The team then brainstormed their key performance measures.  We weighted them to show which measures are most important in achieving the Mission.  Finally, we gave each measure a “Below” and “Exceed” goal.

This Scorecard is reviewed by the head of Primary Care each month with the entire Primary Care staff.  It is a 15 minute meeting to review prior month and year-to-date performance.

Primary Care Performance Scorecard – Post Lean Project

This is the scorecard, six months after we completed the project.  Note, our project worked primarily on the two on-time-delivery measures.  While still far below the goal of 95%, both measures increased from below 10% to the levels shown above.

5S Visual Management

  • Sort
  • Set-In-Order
  • Shine
  • Standardize
  • Sustain

We first addressed the physical disorganization using 5S Visual Management.  The first step in the 5S Visual Management system is to sort through everything in the workplace to determine if it is a Green, Yellow or Red item.

Green – Used frequently, needs to be easily accessed

Yellow – Used, but infrequently, can be stored in a storeroom

Red – Not used, should be reviewed to see if another department needs it and if not thrown away

We worked on 2 exam rooms and the hallway.  The hallway had 9 bulletin boards with random information.  Both exam rooms were set up differently and didn’t have a list of instruments, supplies and pamphlets (patient information).

We completed the 5S’s by labeling everything that needed to be in the room and creating a standard list of instruments, supplies and pamphlets that each room should always have.  We removed every bulletin board in the hallway, except the one by the phone, which got an updated internal phone list and emergency numbers.

The exam room standardization is sustained by making the standardized supply list part of the monthly housekeeping and safety audit.

5S Before and After Picture – Hallway

Spaghetti Diagram

Once the foundation of Lean was in place, with the Performance Scorecard and a visually organized workplace we began to analyze the Primary Care Exam process.  To do this we used two Lean tools, Spaghetti Diagrams and Quickchangeover Time Study.

Lean is a series of tools to identify and eliminate non-value-added activities.  Spaghetti Diagrams track people movement during a process.  We use it to find excess movement of the people in the process.  In this case we were tracking the Nurse, Patient and Physician.  The outcome of the spaghetti diagram is to rearrange the physical workplace to reduce non-value-added move time.

Even after implementing 5S Visual Management and organizing the rooms to have all the instruments, materials and pamphlets, there is excessive movement in and out of the room.  The Primary Care Exam process has created too much movement for the Nurse and Provider.

The Spaghetti Diagram also showed that the room is too big.  Almost half of it is unused by the providers or patient.  If we could rebuild the Primary Care Department we would make the rooms smaller to improve space utilization, fitting more exam rooms into the same envelope.  If you recall from the Assessment, a lack of exam rooms being available was key driver for poor on-time-delivery of care.  During a facility expansion later that year, this was acted on and the exam rooms were halved in size and doubled in number.

Quickchangeover Time Study Analysis

At the same time as we were drawing out the “spaghetti” of people movement we were time studying what was happening during the exam process.

This Lean tool is called Quickchangeover.  Its outcome is getting the patient in and out of the room faster, while improving the quality of service.  Quickchangeover uses time study analysis to understand if there are times when the patient is in the exam process that is wasted time for them.  We want to know what exactly is making the exam take longer than scheduled, so we can improve on-time-delivery of care and make sure that patients are seen on time.

Our exact time study is shown below.  Each step of the process is written on the left and the corresponding duration is in the column “Min per Seq.”  The minutes per sequence are put in either the Uncommitted (patient does not need to be in the room) or committed (patient must be in an exam room).

There is one major finding of this analysis and it had a big positive impact.  The Provider (Physician or Nurse Practicioner) was spending 17.7 minutes entering data into the computer with the patient in the room.  This is called “Completing the Encounter” on the time study below.  The patient does not need to be there, but the Provider wants to enter this data as soon as possible after the exam and usually doesn’t have access to another computer.  So the patient sits and makes small talk, while the Provider enters data.

The team’s solution was to make one room in the Primary Care department a computer data entry room for Providers.  This would cut 17.7 minutes out of the exam process for the patient and the exam room.  With well over 100 exams per day, this gives back the equivalent of 4 exam rooms per day.

Time Study Analysis

Results

  • Improved on-time delivery of care from 9% to 58% in 6 months

The cumulative effect of this Lean Project was a drastic improvement in seeing patients at their appointment times.  While still below the goal, improvements continue to be made in this Hospital’s Primary Care department.  They are currently experimenting with:

  • Staggering breaks
  • Starting half the appointments at 7:45 AM
  • Adding evening hours

All of these ideas are part of the process of increasing room availability and seeing patients on-time.

"*" indicates required fields

Ask us your Lean, Six Sigma, or Supply Chain question.

We're the experts! We'll get back within 48 hrs. with a valuable response.

This field is for validation purposes and should be left unchanged.

“We are pleased that Essex selected Supply Velocity, Inc. as our Lean Implementation Partner. At one facility, we have saved over $350,000 in work-in-process inventory, reduced throughput time from 2 weeks to minutes and increased inventory turns 3 to 8 times per year. All these results are in just 6 months. Our return of investment is very high.”
Terry Etter, Vice President of Operations , Essex Medical Systems
“Supply Velocity has provided the technical expertise and political capital to move our project forward. They have just the right amount of push and the right amount of support. Supply Velocity has helped us make real changes to improve efficiencies in logistics without jeopardizing our performance. We’re happy and our customers are happy.”
David Walters, President, Hy-C
“We used Supply Velocity on our Warehouse optimization project. One of the key characteristics of Supply Velocity is that they listened to our requirements and provided a clear path for our Warehouse processes using lean tools and our future sales growth as objectives.”
Haris Tokalic, President, Grand Rock, Inc.
“Supply Velocity has helped Clean succeed in a number of ways. First, they provided the education that kicked off our Lean Process Improvement journey. They also facilitated a number of large supply chain and process improvement projects including: 1) building quality into our direct-labor productivity incentive program, 2) designing the layout of our garment warehouse, and 3) streamlining our route service process.

We have integrated the methods that Supply Velocity taught us into our management and strategic planning. In the process our quality measurement has improved 22% from 2013 to 2015, we have reduced required annual labor by 2200 hours from the garment facility layout project and we’ve seen 50% decrease in error rate. Obviously the numbers speak for themselves, but just as important, Supply Velocity has been fun to work and have become true partners. They have “taught us how to fish” so our internal teams are able to implement change on their own, with the skills we learned from Supply Velocity. This relationship has been invaluable.”

Jeff Lazaroff, Senior Vice President, Clean Uniform
“Supply Velocity’s Lean Six Sigma System has given us new tools to help improve our sales performance. We have learned new ways to analyze our business which makes problem solving more accurate and has made us better leaders.”
Rachel Andreasson, Executive Vice President – Marketing, Wallis Companies
“In thirty years of hiring consultants, Supply Velocity, Inc. was the first to tell me what they were going to do, set a price they stuck to and substantially exceed my expectations. I have recommended them to friends and acquaintances. They were true partners in assisting with the turnaround of an acquisition we had been struggling with for two years.

Their math-based technology, solid down-to-earth facilitation skills, and positive, patient and enthusiastic attitude combined to make our implementation of Lean a very rewarding experience.

We increased our production by 50% in the first month of implementation and continue to see improvements. Improvements have not only been realized in productivity, but also in quality and morale. We have increased profitability by $2M on flat sales of $10M.

Based on Supply Velocity, Inc.’s integrity and our results, I will continue to refer them to others and utilize them in the future as we expand our company through acquisitions.”

Bill Gilbert, President, Fusion Coatings
“Isolating a problem, finding short, and long term solutions with measurable results is what was promised and results is what was delivered by Supply Velocity. Upon launch of the Lean Six Sigma Selling System, we knew more about our customers, our products, and were able to create a solid plan to increase sales of our most profitable products. Within months of implementation, our booked sales jumped 60% and our most valued customers were getting direct, active, and calculable attention.”
Mark A. Presker, General Manager, Architectural Millwork of St. Louis
“Closure Medical recently completed a major reorganization in order to enhance our ability to rapidly create innovative medical devices. We hired Supply Velocity to help us map out the process and service flows of the new organization that would maximize our product development process (PDP). In four weeks, Supply Velocity helped us envision a new PDP structure, develop measures and accountability for each step, and gain consensus within the organization. Supply Velocity’s focus on speed and accountability helped us complete a critical project in a timely fashion.”
Gabe Szabo, Vice President, Product Development, Closure Medical – A Division of Johnson & Johnson

“Supply Velocity created visibility within our Assurance Services Group… visibility of performance, Client-service, employee satisfaction and processing time. Using the Supply Velocity System, Audit Report Cycle time is down over 50%. We are using his strategies to create greater Client loyalty.”

Fred Kostecki, Partner-In-Charge, Assurance Services, Rubin Brown

“In a time of volatile supply chain disruption, Supply Velocity is helping us develop Demand and Supply Planning processes to proactively tackle these new challenges. They are genuine partners, working with our team, facilitating and teaching.”

Jane Thrasher, Vice President of Supply Chain, Horizon Hobby
“The role of the Erie Insurance Marketing Department has been evolving over the past several years – from a support role to a more critical role of driving growth in our organization. Because of our increased workload and desire to prioritize the most critical projects, we hired Supply Velocity to teach us the skills of Lean Six Sigma.

Participants included the Promotions, Market Research and Agency Licensing sections of the Marketing Department.

We learned valuable tools to help us to prioritize based on the voice of the customer.

I firmly believe these skills made a difference in how we work every day. We are moving new projects forward, eliminating or changing ineffective processes, and we are a much stronger department. We continue to use the tools to help us with our highly-complex and time-consuming projects. Supply Velocity helped us to accomplish our goals.”

Karen Rugare, Director of Marketing, Erie Insurance

“Your process encourages this group to work together, better communicate and have fun doing it.”

George Edinger, President, C&R Mechanical
“In the spring of 2003, the St. Louis Area Chapter of the American Red Cross engaged Supply Velocity, Inc. to perform a study and make recommendations to streamline office processes, maximize cash flow in purchasing and warehousing and restructure and enhance our maintenance department. Supply Velocity, Inc.’s process was methodical, flexible, staff-oriented, inclusive and, above all, trackable.

In the last six months, our Chapter has realized expense savings of over $380,000 annually, and significant improvement in intra-company service levels has been attained. Supply Velocity, Inc. will return to the Chapter periodically throughout the next 18 months to audit our newly implemented processes. We have been pleased with our results and Supply Velocity, Inc.’s professionalism.”

Joe White, CEO, American Red Cross – Saint Louis Chapter
“We are using Supply Velocity’s Lean Six Sigma methods to analyze a variety of processes including rationalizing SKUs (stock-keeping-units). By using math to evaluate SKUs we took some of the emotion out of our decisions. We expect significant increases in sales and productivity from reducing poor performing SKUs.”
Mark Kelso, Director of Process Improvement, Save-A-Lot

“Supply Velocity gave us the tools to analyze our business and processes based on the facts and numbers versus our perceptions. Our common quote was “Let the numbers lead us”. The key for our organization was how quickly we moved from classroom to actual project initiation. We were able to jump in, start using the tools and see a difference right away.

The get-into-action approach was good for our culture.”

Ned Lane, President, CeeKay Supply
“C&R was struggling with labor productivity. The construction crews were often missing materials that they needed to do their work. This caused significant idle time. Supply Velocity, Inc. and C&R used value stream mapping and visual management tools to make dramatic improvements in operations. Most importantly, two years later C&R is sustaining and improving on the implementation. C&R’s return on investment was 11:1. C&R had a record year last year in both sales and profits and would not have been able to pull it off without the changes Supply Velocity, Inc. helped us make.”
Tom Kuthe, V.P. Construction Operations, C&R Mechanical
“Anheuser-Busch Precision Printing had been implementing Lean Operations on our own for the past two years. We needed to move faster and partnered with Supply Velocity, Inc. Through Supply Velocity, Inc.’s mathematical workflow balancing and visual management tools, dramatic improvements were achieved. The entire converting operation was rearranged based on Lean principles. The result is a 20.6% productivity improvement, enabling us to operate with 23 fewer people in production.”
Rich Lavosky, General Manager, Anheuser-Busch Precision Printing
“We engaged with Supply Velocity to help us embed process improvement at all levels of the business. Our team learned from Mitch to let the data drive decisions, to use Lean tools to help us see our processes critically and objectively, and to create a control plan to manage all of the tasks that were the outcome of the data study.

The project turned out to be very significant to the company and most importantly, our customers. We reduced our customer wait times by 40%, and cut in half the labor cost to fulfill customer orders.

Some results are not able to be measured. However, as a result of this project, we have started to build a Lean mindset and culture, which is part of our strategic mission to save our customers money. Supply Velocity has been a valued partner in this mission.”

Dionne Dumitru, COO, Weekends Only
“We used Supply Velocity to rethink our sales process. By analyzing the entire process we found wasted time in our Sales, Admin and Operations departments. Streamlining this process created extra time for each Sales Rep, allowing them to spend more time with Customers and increase the value we add. Gross profit margins are up 40%!

We are now using Supply Velocity to help us rethink our entire Strategic Plan.”

Jeff Reitz, Vice President, Central States Bus
“Many thanks to all three Supply Velocity presenters. I think you guys took a very difficult time for learning and capitalized on everyone’s time and training needs. I truly hope this helps your business as this was a considerable undertaking on the part of Supply Velocity. Outstanding!!”
Mark Holdinghausen, VP of Operations, DEMA Engineering
“Supply Velocity is driving instrumental change in our inventory management processes. This is critical for us to be competitive in a supply chain environment with numerous disruptions. They are making change happen, which can be challenging in a 182 year old organization.”
Jim Carroll, Executive Vice President Operations, Schaeffer Manufacturing
“For several years we have worked with Supply Velocity to support us with their expertise on Lean Operations and Supply Chain Management. Supply Velocity has helped us implement Lean, improve our inventory systems, and educate our people. They are professionals who are always available to help us as needed.”
Lorenza Pasetti, CEO, Volpi Foods
“In 2015 we began working with Dr. Mitch Millstein to optimize our inventory locations supporting e-commerce and in-store inventory needs. From this work we developed a new omni-channel warehousing and inventory plan that entirely redefined our approach to warehousing, inventory management, store distribution and fulfillment. As a result of the analyses by Dr. Millstein we have begun the move to an improved omni-channel design by reassigning MSAs to new warehouses, greater leveraging of in-store inventories to satisfy e-commerce demands, and exploring acquisitions of new warehousing space in strategic locations. We have already seen an improvement of $300,000 from both more efficient shipping strategies due to better inventory management.”
Rob Bowers, Vice President of Strategy, Total Hockey

“I am thrilled to provide this testimonial for Supply Velocity and their outstanding work in implementing Lean Warehouses and processes at Crescent Parts & Equipment through the COVID pandemic. With their data-first focus and Mitch’s exceptional coaching and experience, they transformed our business into a more supply chain-oriented organization, enabling us to grow while prioritizing employee safety and creating a better work environment. Supply Velocity’s expertise in Lean methodologies and their comprehensive evaluation of our customers have been instrumental in optimizing our operations and increasing customer satisfaction. We highly recommend Supply Velocity to any company seeking to implement Lean processes and enhance their supply chain efficiency.”

Josh Cole, Director of Supply Chain, Crescent Parts & Equipment
“Myerson engaged Supply Velocity, specifically Ray Davis to visit our plant in Trinidad to conduct a two day assessment of our production procedures and provide us feedback on areas for improvement and where applicable, areas for future analysis.

Put simply, we got everything we paid for and in addition to more in depth analysis, we got specific tasks that were immediately actionable. Our local management team found Ray to be engaging, highly credible and insightful based on his wide experience. In other words the cultural differences and lack of specific industry knowledge weren’t impediments to things we could implement immediately and on our own. In a nutshell it was money well spent and will pay itself back many times over.”

Lee Hartwell CPA, Plant Manager, Myerson Tooth
“Mitch Millstein and his team helped guide our shop fabrication division in the re-layout of our custom pipe and steel fabrication facility when we moved into a new building. It is not only the results but how he helped. We were involved in every step. I personally did time studies and was able to see the non-value added steps required to manufacture in our old layout. When we created our new layout, everyone was involved, from the executive team to our direct labor force. With Mitch’s help we increased our throughput by a 3x multiple, while providing more competitive prices to our clients as a result of the efficiency improvements.

This has enabled us to not only make more money but also to expand our commercial reach and serve more, and larger customers. I would recommend Supply Velocity to any company that wants to make improvement in supply chain and operations.”

Geoff Gross, President, Gross Mechanical
“Our experience with Supply Velocity was one of the best values we have ever had from a consulting project. Cyril Narishkin brought a structured lean methodology, invaluable experience and engaging facilitation skills to help us streamline a very complex and disjointed sales order process. Just as importantly, our team now has the knowledge and process competencies to address other business improvement opportunities going forward.”
Mike Howard, CEO, Aspeq