Lean Kaizen Improvements – Shock Tech

Case Study Snapshot

Results At A Glance

Quoting & Prototyping Time

−50%

Kaizen Events

4+ Per Year (3rd Year)

Quality Issue

Resolved via Standard Work

PO Review Process

Standardized

Key Takeaways

  • 2-day management working session aligned leadership on vision and Kaizen roadmap.
  • Company-wide Lean/Kaizen training built buy-in from employees who had never participated in CI.
  • DMAIC methodology structured each 4-day Kaizen event for systematic problem solving.
  • Standard work and process flow mapping eliminated quality issues and cut cycle times.

Where This Approach Fits

Best for small-to-mid manufacturers needing to build a continuous improvement culture while overcoming resistance to change.

Download Case Study

Problem / Challenge

A privately owned engineering-manufacturer of specialized systems for the aerospace industry needed to evolve from a small niche business to a growing market leader. The operational processes that worked in the past were inadequate for the future and were constraining growth. Personnel had become accustomed to the old ways of doing business and were resistant to change.

The GM knew the company needed to improve its processes and change its culture to one that embraces change and empowers its people to be involved in overcoming growth obstacles. This required the GM’s management team to grow and learn to embrace change.

The GM was seeking a Lean-Kaizen consulting firm to partner with and facilitate the transition to a continuous improvement culture that would take the company into the future.

Management Team Planning

We started by facilitating the management team through a 2-day working session. The first day was an Assessment, touring the facility and meeting the team one-on-one. The second day the management team met as a group and the GM laid out his vision for the future.

A culture that:

  • Embraces change and growth
  • Promotes and rewards initiative to make improvements
  • Involves the workers who do the work

The rest of the session was spent planning the next steps:

  • Management team training on Lean, Kaizen and empowering teams
  • Create a plan to conduct 4 Kaizen events, 4-days each, over 12 months, with topics focused on overcoming growth constraints
  • Agreed that all employees would receive 90 minute Lean/Kaizen overview training

Company-Wide Training

The training prepared employees for changes and helped make them feel a part of it. Most never worked on a CI project team before, therefore getting them to participate would be challenging. During the training we covered:

  • Future state vision for the company
  • Brainstormed overcoming growth constraints
  • Presented the Kaizen plan for the year

Kaizen Agenda & Tools

  • Problem Statement
  • Key measures or data needed
  • High level Value Stream Map to identify growth constraints
  • Current state process flow map for core processes
  • Analysis, potential recommendations and discussions with subject matter experts
  • Develop KPIs for monitoring performance
  • Final recommendations and improvement plan including training and standard work
  • Action item list with follow up plan

Kaizen DMAIC 4-Day Methodology

Each Kaizen event followed a structured 4-day DMAIC methodology – Define, Measure, Analyze, Improve, Control – to systematically identify root causes, develop solutions, and ensure transition of responsibility to process owners for sustained results.

Process Flow Map

As part of the Kaizen events, detailed process flow maps were created to document the current state of core processes, identify bottlenecks, and design improved workflows.

Results

The Kaizen events were successful, but like all real improvement initiatives, they required follow-up and communication. Personnel needed time to adjust their thinking before they fully adopted the new management approach and their empowered role.

The first four Kaizens included a product quality issue, two processing speed (too slow) issues, and a process quality/accuracy issue. 4 Kaizen topics chosen: (1) quality, (2) process speed, (1) process accuracy.

  • Significantly reduced the quality issue by establishing standard work for a key process
  • Reduced the time required for the quoting process and the prototyping process by 50%
  • Updated and standardized the purchase order review process to ensure the company met contractual requirements

We continue to facilitate multiple Kaizens per year, going on our 3rd year.

Reference

Joseph Fuggini, General Manager

Learn more about our Lean Process Improvement and Lean Assessment services.

Need Similar Results?

Request A Consultation

We can review your current operation, pinpoint constraint areas, and outline practical next steps.

Related Case Studies

Client Voice

What Clients Say

View All Testimonials

"If you are looking for someone to help drive improvements, create repeatable processes and mentor younger staff in your facility then reach out to Supply Velocity. Your expertise and dedication have driven significant im..."

Tim Donohoe

COO, Chemline

"I am thrilled to provide this testimonial for Supply Velocity and their outstanding work in implementing Lean Warehouses and processes at Crescent Parts & Equipment through the COVID pandemic. With their data-first focus..."

Josh Cole

Director of Supply Chain, Crescent Parts & Equipment

"For several years we have worked with Supply Velocity to support us with their expertise on Lean Operations and Supply Chain Management. Supply Velocity has helped us implement Lean, improve our inventory systems, and ed..."

Lorenza Pasetti

CEO, Volpi Foods

"Supply Velocity is driving instrumental change in our inventory management processes. This is critical for us to be competitive in a supply chain environment with numerous disruptions. They are making change happen, whic..."

Jim Carroll

Executive Vice President Operations, Schaeffer Manufacturing

"In a time of volatile supply chain disruption, Supply Velocity is helping us develop Demand and Supply Planning processes to proactively tackle these new challenges. They are genuine partners, working with our team, faci..."

Jane Thrasher

Vice President of Supply Chain, Horizon Hobby

"Mitch Millstein and his team helped guide our shop fabrication division in the re-layout of our custom pipe and steel fabrication facility when we moved into a new building. It is not only the results but how he helped...."

Geoff Gross

President, Gross Mechanical

"In 2015 we began working with Dr. Mitch Millstein to optimize our inventory locations supporting e-commerce and in-store inventory needs. From this work we developed a new omni-channel warehousing and inventory plan that..."

Rob Bowers

Vice President of Strategy, Total Hockey

"Myerson engaged Supply Velocity, specifically Ray Davis to visit our plant in Trinidad to conduct a two day assessment of our production procedures and provide us feedback on areas for improvement and where applicable, a..."

Lee Hartwell CPA

Plant Manager, Myerson Tooth

"Supply Velocity has provided the technical expertise and political capital to move our project forward. They have just the right amount of push and the right amount of support. Supply Velocity has helped us make real cha..."

David Walters

President, Hy-C

"Our experience with Supply Velocity was one of the best values we have ever had from a consulting project. Cyril Narishkin brought a structured lean methodology, invaluable experience and engaging facilitation skills to..."

Mike Howard

CEO, Aspeq

"Supply Velocity has helped Clean succeed in a number of ways. First, they provided the education that kicked off our Lean Process Improvement journey. They also facilitated a number of large supply chain and process impr..."

Jeff Lazaroff

Senior Vice President, Clean Uniform

"We engaged with Supply Velocity to help us embed process improvement at all levels of the business. Our team learned from Mitch to let the data drive decisions, to use Lean tools to help us see our processes critically a..."

Dionne Dumitru

COO, Weekends Only

"Supply Velocity gave us the tools to analyze our business and processes based on the facts and numbers versus our perceptions. Our common quote was "Let the numbers lead us". The key for our organization was how quickly..."

Ned Lane

President, CeeKay Supply

"We used Supply Velocity to rethink our sales process. By analyzing the entire process we found wasted time in our Sales, Admin and Operations departments. Streamlining this process created extra time for each Sales Rep,..."

Jeff Reitz

Vice President, Central States Bus

"Supply Velocity created visibility within our Assurance Services Group... visibility of performance, Client-service, employee satisfaction and processing time. Using the Supply Velocity System, Audit Report Cycle time is..."

Fred Kostecki

Partner-In-Charge, Assurance Services, Rubin Brown

"Supply Velocity's Lean Six Sigma System has given us new tools to help improve our sales performance. We have learned new ways to analyze our business which makes problem solving more accurate and has made us better lead..."

Rachel Andreasson

Executive Vice President - Marketing, Wallis Companies

"The role of the Erie Insurance Marketing Department has been evolving over the past several years - from a support role to a more critical role of driving growth in our organization. Because of our increased workload and..."

Karen Rugare

Director of Marketing, Erie Insurance

"Isolating a problem, finding short, and long term solutions with measurable results is what was promised and results is what was delivered by Supply Velocity. Upon launch of the Lean Six Sigma Selling System, we knew mor..."

Mark A. Presker

General Manager, Architectural Millwork of St. Louis

"In the spring of 2003, the St. Louis Area Chapter of the American Red Cross engaged Supply Velocity, Inc. to perform a study and make recommendations to streamline office processes, maximize cash flow in purchasing and w..."

Joe White

CEO, American Red Cross - Saint Louis Chapter

"We are using Supply Velocity's Lean Six Sigma methods to analyze a variety of processes including rationalizing SKUs (stock-keeping-units). By using math to evaluate SKUs we took some of the emotion out of our decisions...."

Mark Kelso

Director of Process Improvement, Save-A-Lot

"Anheuser-Busch Precision Printing had been implementing Lean Operations on our own for the past two years. We needed to move faster and partnered with Supply Velocity, Inc. Through Supply Velocity, Inc.'s mathematical wo..."

Rich Lavosky

General Manager, Anheuser-Busch Precision Printing

"C&R was struggling with labor productivity. The construction crews were often missing materials that they needed to do their work. This caused significant idle time. Supply Velocity, Inc. and C&R used value stream mappin..."

Tom Kuthe

V.P. Construction Operations, C&R Mechanical

"Your process encourages this group to work together, better communicate and have fun doing it."

George Edinger

President, C&R Mechanical

"Closure Medical recently completed a major reorganization in order to enhance our ability to rapidly create innovative medical devices. We hired Supply Velocity to help us map out the process and service flows of the new..."

Gabe Szabo

Vice President, Product Development, Closure Medical - A Division of Johnson & Johnson

"We are pleased that Essex selected Supply Velocity, Inc. as our Lean Implementation Partner. At one facility, we have saved over $350,000 in work-in-process inventory, reduced throughput time from 2 weeks to minutes and..."

Terry Etter

Vice President of Operations, Essex Medical Systems

"In thirty years of hiring consultants, Supply Velocity, Inc. was the first to tell me what they were going to do, set a price they stuck to and substantially exceed my expectations. I have recommended them to friends and..."

Bill Gilbert

President, Fusion Coatings

"Many thanks to all three Supply Velocity presenters. I think you guys took a very difficult time for learning and capitalized on everyone's time and training needs. I truly hope this helps your business as this was a con..."

Mark Holdinghausen

VP of Operations, DEMA Engineering

"We used Supply Velocity on our Warehouse optimization project. One of the key characteristics of Supply Velocity is that they listened to our requirements and provided a clear path for our Warehouse processes using lean..."

Haris Tokalic

President, Grand Rock, Inc.

"I’d recommend Supply Velocity to organizations looking for a hands‑on, data‑driven warehouse assessment with actionable outputs - particularly those dealing with operational change, new systems, or scaling challenges."

Jayson Wickenkamp

Senior Vice President, Image Solutions